18.03.2024
Work continues on the construction of 11-meter motor yacht. The painting crew is working on the last layer of primer, making the surface perfectly smooth for painting in a mirror glance.
On March 19, the preparation work will be completed, then "dust removal" will be done using a professional vacuum cleaner, wet cleaning, limiting the space with plastic tape, and worming the necessary heat inside, and in the evening painting job will begin, which will be completed by March 22.

For work inside:
The galley cabinet frame has been installed.
The frame of the wardrobe in the salon has been installed.
The doorway was welded in and the front door was made; it was also prepared for painting. The door to the toilet is also made and ready for painting.

The frame of the sofa in the salon will be installed in the near future. Work continues on the production of templates for wall and ceiling panels and other wooden interior elements.
Made on
Tilda