07.05.2024
Construction progress of 11-meters motor yacht.
Both engines are installed, control wiring is done, a steering wheel and a controller are installed on the console.
The Zeepwake stabilization system is being installed.
The production and fitting of teak flooring in the yacht's salon continues.
The radar mast is ready. We are very pleased with the results, it turned out to be a real master-peace!
The installation of navigation equipment and video surveillance systems has begun.
All wall panels have arrived at the shipyard. Installation will begin immediately after the electrical wiring is completed.
Made on
Tilda