23.05.2024

Building progress of 11-meters motor yacht.

Antifouling coating application has begun.

Work continues on finishing the console with veneer.

Work continues on upholstering window frames with Nowatex material and precise fitting.

A sliding door to the cabin was installed.

Sliding sunroofs are installed.

Kingstons are installed on the right and left sides to drain underdeck water.

The installation of the cabinet in the cabin has begun.

Electrical work in the cabin continues.

The installation of the main switchboard (Main distribution board) is being prepared.

An escape hatch was installed in the cabin.

Adjusting the panels on the toilet wall.

The bilge pump is installed and connected.

The macerator pump is installed and connected.

Installation of navigation lights on the radar mast.

Teak flooring is in the final stage of completion, adjustment is in progress on site.