13.11.2024

A short video review of the Teknomar 007#7 construction process in Hungary.

The assembly and welding of the cabin roof and the aft door frame has begun. All the elements fit together well, and their adjustment and assembly took a minimum of time. Welding inside the cabin is nearing completion.

The arrangement of the bow door frame and preparation for the installation of the door itself has begun. In the bow cockpit, a place has been marked for cutting out the inspection hatch of the bow thruster, as well as tracing the electrical wiring for it along the starboard side. Before finishing the inner sides with carpet, two additional inspection hatches will be cut on both sides to access the electrical wiring.
Made on
Tilda