23.09.2025

Assembly of the garbage collection catamaran continues.

The electric motor batteries have been installed and securely fixed to the hull. Both motors are mounted to the transom and connected to the batteries. Electrical wiring is being installed in the wheelhouse, and work has begun on paneling the ceiling. The auxiliary bucket for apparel have been welded.
Made on
Tilda